The xr-3 team made solid progress today! We met at school for about 5 hours and got a lot done! We were able to mount our transmission, so that means we will be able to measure/mark/cut our half-shafts as soon as we get them back from the machine shop. We ordered our bolts for the rear brake caliper so those should be getting here this week. We were able to weld the chain assembly for the steering, and we also ordered the Coupler that is used for attaching the steering column and the rack and pinion so that should also be getting here soon. The shift tube was cut, and we will be working on getting the gear stick on the car.
We're still waiting on our parts that are at the machine shop, as soon as those are done we will assemble our steering column, place our spacer and mount our power train! Remember guys we got less than two weeks to get it driving, so lets get to it!